Project Highlights
Demolition of the Cooper River Bridges
Charleston, South Carolina
•
Demolition and recycling of two 2-mile long bridges over two rivers
•
Bridge sections removed via both explosive demolition and lowering by jacks into barges
•
All demolition work on bridge superstructure and substructure performed by unique equipment—cranes and hydraulic machines on barges
•
Removal of foundations to elevation 65.0 ft
•
Construction of 1,250 ft long observation pier
•
Reconstruction of city streets in footprint of old bridge approaches
•
Restoration of wetlands |