Fuller Warren Bridge Demolition
Jacksonville, Florida

Project Date: 2005

Owner:
Florida DOT/Balfour Beatty Infrastructure Inc.

Project Engineers/Managers:

Bechtel Parsons Brinkerhoff





 

Demolition of the Fuller Warren Bridge with the newly constructed bridge alongside the existing bridge

 

Project Highlights

Fuller Warren Bridge Demolition

Jacksonville, Florida

• Demolition of the 195 Fuller Warren 3000 ft. long
Structural steel and concrete bridge located over the St.
Johns River

• Demolition methods included:

            • Subsurface pile shearing

            • Explosives demolition

            • Hydraulic hammer and hydraulic shear demolition
           and dredging

• Demolition included shoreline restorations and
environmental controls

• Construction of a 200 ea steel cluster pile fender system

 