Project Highlights
Prison Demolition / Late Drumlin Excavation
Deer Island, Massachusetts
• Movement and redevelopment
of more than 1.3 million cubic yards of environmentally
sensitive soils.
• Construction of a revetment for protection of seaward
section of landfill.
• Material was moved from the center of the island onto
barges via a 1400 foot conveyer belt.
• Demolition, removal and decontamination of infiltration
pools (waste lagoons) and diffusers.
• Construction of impermeable cap for drumlin and landfill.
• Demolition of 100 year old prison.
• Performed extensive site preparation work for future
contracts.
|