Naval Weapons Facility
Colts Neck, Massachusetts


Project Date: 2003

Owner:
Naval Facilities Engineering
Command

Project Engineers/Managers:

 


 
The Wood 1 dredge proves itself as a versatile tool for harbor dredging in difficult weather conditions.
 

Project Highlights

Naval Weapons Facility
USN Colts Neck, New Jersey

• Dredged to depths of 41 feet MLW

• A dredge volume of 60,000 cubic yards of contaminated
sediment adjacent to active deep water piers required working
24 hours a day to meet the 60 day completion schedule

• Rigorous environmental controls due to endangered fish
habitat

• Exposure to northeast winds presented difficult dredging
conditions

•Equipment included the Wood 1, Eddie Carroll, and Joe
Verrochi

 