Project Highlights
New Bedford Harbor Dredge / Capping
New Bedford, Massachusetts
• Wood 1 Dredge removed the top of the proposed new CAD cell #1 using a “CableArm” environmental clamshell-style bucket
• Removed material was loaded into split hull dump scows for disposal into the Borrow Pit
• After removing the top of the CAD, 85,000 CY of sand was dredged, completing the CAD cell construction
• Excavated material was successfully used for the EPA’s pilot PCB Underwater Capping Project in the New Bedford Harbor
• All work performed met or exceeded the environmental constraints specific to this project
|