Naval Shipyard
Portsmouth, New Hapshire


Project Dates: 2002

Owner:
Naval Facilities Engineering
Command

Project Engineers/Managers:



 


 
Cashman crews worked seven days a week to meet a demanding dredging schedule.
 

Project Highlights

Naval Shipyard
Portsmouth, New Hampshire

Dredged to depths of 41 feet MLW

A dredge volume of 30,000 cubic yards of material was
removed within an active nval facility.

Required upland disposal into an on-site containment facility.

Work executed during winter conditions using the A. J
Fornier hydrualic back-hoe excavator dredge equipped with
computer guidance excavation control.

Dredge and barge transportation conducted through the
extreme currents odf the Piscataqua River requiring careful
planning of the work around the tides.


 



Copyright© 2005, Jay Cashman, Inc., All rights reserved.

Website Designed by Modern Creative