Project Highlights
Beazer Site Remediation
Port Newark, New Jersey
Cleared the six acre site of building debris and steel and disposed of at off-site landfills.
• Stripped the upper two to five feet of soil and stockpiled for treatment.
• Material was placed in a pug-mill
and mixed with batched cement and placed back in the
“cells” in 1 to 2 foot layers.
• Treated areas greater than five feet were in-situ soil mixed using cement slurry.
• The remediated site was finally capped with heavy duty pavement for container storage use for loads up to 500 psf.
|