Project Highlights
Perth Amboy Marina
Perth Amboy, NJ
• Mechanically dredged and off loaded contaminated material
from inside the marina onto water tight scows.
• Transported material to a dewatering facility in Port Elizabeth, New Jersey.
• Material was stabilized using fly ash then loaded onto rail
cars and shipped to Pennsylvania for disposal.
• Approximately 30,000 cubic yards were removed at a rate of
1,000 cubic yards per day.
• A turbidity curtain was utilized to contain suspended
sediment within the boundaries of the contracted area.
• Production rate of dredging
operation exceeded owner's
expectations.
• Coordinated dredging and off loading activities through tide
cycles for optimum performance.
|