Project Highlights
Haddam Neck Plant Decomissioning
East Hampton, Connecticut
• Dredged river channel to gain access to CY discharge canal
• Material processed for disposal as non-regulated dredge spoil
• Dredged CY discharge canal to site barge slip generating 3,000 cubic yds of spoil containing low levels of plant related radioactive material
• Processed the material by screening, then dewatering with pug mill and addition of small percentage of cement on a batch basis
• After processing Cashman loaded material into B-25 boxes supplied by CY onto a barge
• Loaded containers weighed approximately 9,000
lbs each
• All waste transferred by barge to the Gateway Terminal in New Haven, CT for shipment to ultimate disposal facility
|