Project Date: 2/00-11/01
Owner:
New England Aquarium
|
|  |
 |
|
| |
Project
Highlights
New England Aquariumv IMAX Theatre
Boston , Massachusetts
Foundation work included land and water based driven pipe piles and drilled mini-piles. Mini-piles were required to support the structure since they were installed through an existing granite seawall thus precluding the use of conventional driven piles. The mini-pile system was designed by JCI. Concrete work included a suspended slab over the water and a lower level slab constructed approximately 8 feet below high tide.
|
|