Project Date: 12/94-11/95
Owner:
Massachusetts
Highway Department
Project Engineers/Managers:
HDR Engineering, Inc.
|
"The
project was completed on time and at a significant savings
to the client."
--William
Barker, Engineer - HDR Engineering, Inc.
|
 |
 |
|
| |
The five-span Menauhant
Road Bridge crosses scenic
Green Pond in Falmouth, Massachusetts.
|
| |
Project
Highlights
Menauhant Road Bridge
Falmouth, Massachusetts
• Use of precast/prestressed concrete for major structural
elements eliminated the need for cofferdams, dredging
and excavation, thus keeping environmental disruption
to a minimum.
• This was the first use of precast/prestressed sheet
piles for a bridge in New England.
• The project was completed in a compact time frame
from December, 1994 through November, 1995.
• The Menauhant Road Bridge was named a “Best
Bridge” of 1996 by the Precast/Prestressed Concrete
Institute.
|
|