Project
Highlights
Boston Harbor Project Ventilation Pipe
Boston, Massachusetts
• Design of a steel caisson ventilation system
providing a water-tight connection at the sea-bed interface
in 120 feet of water.
• Work was performed at 55 diffuser locations,
nine miles off-shore.
• Installation
of ventilation system and final connections was performed
in approximately 3 months.
• JCI
received the prestigious NOVA award for innovation in
construction from the Construction Innovation Forum.
|