Conley Terminal
Boston , Massachusetts


Project Dates:

Owner:
MassPort

Project Engineers/Managers:


 

 

 

 

Project Highlights

Conley Terminal Boston
Boston , Massachusetts

• Demolished 500 LF section of existing concrete
on wooden pile pier structure

• Drove 1,250 new concrete filled pipe piles

• Formed and poured new freight pier structure
with crane rail supporting beams at 200 on center

• Drove 22,600 SF of steel sheeting

• Formed and poured 10,000 CY of monolithic 2
foot-thick structural concrete deck with traveler
form

• Furnished and installed crane rail