Florida Power & Light Cable Crossing
Miami Harbor, Florida


Project Dates: 2009

Owner:
Florida Power & Light

Project Engineers/Managers:
Jacobs Civil, Inc.


 

 

Lowering of pipe within Miami Harbor

 

Project Highlights

Florida Power & Light Cable Crossing
Miami Harbor, Florida

•Working together with UTEC to install 15,000 LF of 138
KV Electric Cable in a sub aqueous crossing, in a fully
welded 10” pipe

•3 ea. 5,000 ± ft. strings of pipe in a directional-drilled hole.
Our scope included:

           Installation of two cofferdams

           • Welding of the pipe strings

           • Pulling electrical cable

           Splicing of electrical cable