Project Highlights
Florida Power & Light Cable Crossing
Miami Harbor, Florida
•Working together with UTEC to install 15,000 LF of 138
KV Electric Cable in a sub aqueous crossing, in a fully
welded 10” pipe
•3 ea. 5,000 ± ft. strings of pipe in a directional-drilled hole.
Our scope included:
• Installation of two cofferdams
• Welding of the pipe strings
• Pulling electrical cable
••Splicing of electrical cable