Project Date: 6/02-3/03
Owner:
Highway Department
Project Engineers/Managers:
Bechtel/Parsons
Brinckerhoff
|
“The largest
soil mixing project ever undertaken, worldwide...a watershed
in U.S. geotechnical engineering."
-- Civil Engineering Magazine
|
 |
 |
|
| |
Installation of Earth Support Walls and Deep Soil Mixing from barges and Slurry Wall Installation in background.
|
| |
Project Highlights
Fort Point Channel-Deep Soil Mixing Project
Boston, Massachusetts
• Soil stabilization on an unprecedented scale,
to a depth of 120 feet.
• Replacement of both mainline railroad and traffic
bridges.
• Installation of 300,000 sq.ft. of steel sheet
piling and four cofferdams.
• Extensive dredging, demolition and excavation
in a site that has experienced more than two centuries
of waterfront construction.
• Construction of a 400-foot long cut and cover
slurry wall supported tunnel structure.
• Work in a high traffic downtown area adjacent to railroad, mass transit, postal terminal, and the world headquarters of the Gillette Company.
|
|