Project Highlights
Mass Maritime Academy Pier Facility
Bourne, Massachusetts
• Demolition of an existing wharf with timber piles and concrete deck.
• Installation of a 350 foot long sheet-pile anchored bulkhead.
• Installation of a new wharf structure (350 feet by 50 feet) supported on approximately 110, 16-inch diameter closed end pipe piles. The deck structure consisted of pre-cast concrete pile caps and deck with a finished cast in-place concrete surface.
• Installation of new pre-cast concrete fender system.
• Installation of new sewer line
and pump station.
• Installation of 2,000 tons of
rip-rap bulkhead toe stabilization material.
|