Project Date: 12/94-11/95
Owner:
Massachusetts
Highway Department
Project Engineers/Managers:
HDR Engineering, Inc.
|
"The project was completed
on time and at a significant savings to the client.”
--William Barker, Engineer - HDR Engineering, Inc.
|
 |
 |
|
| |
The five-span Menauhant Road Bridge crosses scenic
Green Pond in Falmouth, Massachusetts.
|
| |
Project Highlights
Menauhant Road Bridge
Falmouth, Massachusetts
• Use of precast prestressed concrete for major
structural elements eliminated the need for cofferdams,
dredging and excavation, thus keeping environmental
disruption to a minimum.
• This was the first use of precast prestressed
sheet piles for a bridge in New England.
• The project was completed in a compact time frame
from December, 1994 through November, 1995.
• The Menauhant Road Bridge was named a “Best
Bridge” of1996 by the Precast/Prestressed Concrete
Institute.
|
|