Project Highlights
Wollaston Beach Seawall
Quincy, Massachusetts
• Revetment reconstruction on the exposed Quincy shore.
• Over 50,000 tons of stone placed in 6 months during winter conditions.
• Concrete wall construction along 500 feet of beach constructed within a sheet pile cofferdam.
• Stone materials provided from a Cashman quarry allowed great control of materials to meet the strict size, weight and hardness specification criteria.
|