Wollaston Beach Seawall
Quincy, Massachusetts


Owner:
Metropolitan District Commission

Project Engineers/Managers:
MDC




"Being able to deliver revetment material from our own quarry was a key component of this project.”

--Mike Sullivan, Superintendant



 

 

Careful planning of the work around the tides was required for successful completion of the seawall.

 

Project Highlights

Wollaston Beach Seawall
Quincy, Massachusetts

• Revetment reconstruction on the exposed Quincy shore.

• Over 50,000 tons of stone placed in 6 months during winter conditions.

• Concrete wall construction along 500 feet of beach constructed within a sheet pile cofferdam.

• Stone materials provided from a Cashman quarry allowed great control of materials to meet the strict size, weight and hardness specification criteria.