The Saddleback Ridge Wind Project is a 34.2-megawatt (MW), 12-turbine wind project located in Carthage, Maine. GE’s 2.85- MW turbines use state-of-the-art technology that maximizes efficiency and produces more electricity with fewer towers. In 2014, all major site work and transmission lines were completed by local construction teams. Three out of twelve turbines were erected and began operating in late 2014. In summer 2015, the last nine turbines were delivered and installed. The project was completed in September 2015, and all twelve turbines are now producing clean energy. 

The wind turbines are expected to generate nearly 105 million kilowatt-hours (kWh) of clean, renewable electricity each year. That is enough to power about 17,500 homes (based on 500 kWh per home per month), and reduces the amount of CO2 emissions by the equivalent of ~5.4 million gallons of gasoline consumed. 

Many Maine companies were involved in the development and construction of the Saddleback Ridge Wind Project: Reed & Reed, Sargent Corporation, RLC Engineering, TetraTech, Maine Drilling & Blasting, Underwood Electric, Comprehensive Land Technologies, E.L Vining & Son, Vining Custom Cabinets, B&D Logging, and Roland Tyler. 


PROJECT HIGHLIGHTS 

  • In 2014, all major site work and transmission lines were completed by local construction teams. Three out of 12 turbines were erected and began operating in late 2014. 
  • In summer 2015, the last nine turbines were delivered and installed. 
  • The project was completed in September 2015, and all 12 turbines are now producing clean energy. 
Download Project Sheet
Download PDF

Details
Saddleback Ridge Wind, LLC
$82 million
2014 - 2015